<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Crandon Times &#187; Construction</title>
	<atom:link href="http://www.crandontimes.com/category/construction/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.crandontimes.com</link>
	<description>Key Biscayne: News, Food, Arts &#38; Events</description>
	<lastBuildDate>Fri, 14 Nov 2008 02:08:21 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>This Weekend: Beware the Toll Traffic</title>
		<link>http://www.crandontimes.com/2008/05/16/this-weekend-beware-the-toll-traffic/</link>
		<comments>http://www.crandontimes.com/2008/05/16/this-weekend-beware-the-toll-traffic/#comments</comments>
		<pubDate>Fri, 16 May 2008 22:40:04 +0000</pubDate>
		<dc:creator>Tom</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[This Weekend]]></category>
		<category><![CDATA[toll]]></category>
		<category><![CDATA[traffic]]></category>

		<guid isPermaLink="false">http://www.crandontimes.com/?p=18</guid>
		<description><![CDATA[
From the village website:
Residents are advised that Miami-Dade County Department of Public Works (PWD) is in the process of replacing the existing seven (7) fiberglass toll booths at the Rickenbacker Toll Plaza with new stainless steel toll booths. The project includes upgrading toll plaza’s electrical service, demolishing existing concrete slabs and constructing a new slab [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://flickr.com/photos/striderv/2478431732/"><img class="alignnone size-full wp-image-19" title="Toll Booth" src="http://www.crandontimes.com/wp-content/uploads/2008/05/tollbooth.jpg" alt="" width="500" height="311" /></a></p>
<p>From the <a href="http://www.keybiscayne.fl.gov/">village website</a>:</p>
<blockquote><p>Residents are advised that Miami-Dade County Department of Public Works (PWD) is in the process of replacing the existing seven (7) fiberglass toll booths at the Rickenbacker Toll Plaza with new stainless steel toll booths. The project includes upgrading toll plaza’s electrical service, demolishing existing concrete slabs and constructing a new slab for each toll booth. Unfortunately, we can only replace one booth at a time.  The project will continue until further notice.</p>
<p>PWD will strive to minimize the negative impact on vehicular traffic. Motorists should expect delays on weekends as certain lane(s) may be out of service.</p>
<p>Transponder pass lane locations may shift as toll booth replacement continues. Residents and other pass holders also are reminded that transponder lanes may be converted to transponder/cash accepted lanes during periods of heavy traffic onto the Causeway.</p>
<p>For more information, contact:</p>
<blockquote><p><strong> </strong>Delfin A. Molins<br />
Public Information 	Officer<br />
Miami-Dade County Public Works Department<br />
Stephen P. Clark Center<br />
111 N.W. 1st Street, Suite 1610<br />
Miami, Florida 33128<span><br />
(305) 375-1682</span></p></blockquote>
</blockquote>
]]></content:encoded>
			<wfw:commentRss>http://www.crandontimes.com/2008/05/16/this-weekend-beware-the-toll-traffic/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Construction woes make it to NBC 6</title>
		<link>http://www.crandontimes.com/2008/04/28/construction-woes-make-it-to-nbc-6/</link>
		<comments>http://www.crandontimes.com/2008/04/28/construction-woes-make-it-to-nbc-6/#comments</comments>
		<pubDate>Tue, 29 Apr 2008 00:07:00 +0000</pubDate>
		<dc:creator>Tom</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Island News]]></category>

		<guid isPermaLink="false">http://www.crandontimes.com/?p=11</guid>
		<description><![CDATA[
The plight of some Key Biscayne residents due to ongoing construction has made its way to a segment on NBC 6.  To view the video, click here.
]]></description>
			<content:encoded><![CDATA[<p><a href="http://video.nbc6.net/player/?id=241574"><img class="alignnone size-full wp-image-12" title="Construction on NBC6" src="http://www.crandontimes.com/wp-content/uploads/2008/04/keyconstruction.png" alt="" width="401" height="331" /></a></p>
<p>The plight of some Key Biscayne residents due to ongoing construction has made its way to a segment on NBC 6.  To view the video, <a href="http://video.nbc6.net/player/?id=241574">click here</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.crandontimes.com/2008/04/28/construction-woes-make-it-to-nbc-6/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sewer/Water Pipe Project Progress Meeting</title>
		<link>http://www.crandontimes.com/2008/04/21/sewerwater-pipe-project-progress-meeting/</link>
		<comments>http://www.crandontimes.com/2008/04/21/sewerwater-pipe-project-progress-meeting/#comments</comments>
		<pubDate>Mon, 21 Apr 2008 17:18:12 +0000</pubDate>
		<dc:creator>Tom</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Events]]></category>

		<guid isPermaLink="false">http://www.crandontimes.com/?p=9</guid>
		<description><![CDATA[If you&#8217;re one of the residents dealing with the endless sewer project, you might want to attend the Project Progress meeting tomorrow morning. Too busy? Visit the village&#8217;s website for a street-by-street report on the project progress.
Date: April 23, 2008
Time: 10:30 am
Village Hall, 2nd Floor (Suite 250)
Building, Zoning &#038; Planning Conference Room
88 West McIntyre Street
Key [...]]]></description>
			<content:encoded><![CDATA[<p>If you&#8217;re one of the residents dealing with the endless sewer project, you might want to attend the Project Progress meeting tomorrow morning. Too busy? Visit the village&#8217;s website for a <a href="http://www.keybiscayne.fl.gov/index.php?src=news&#038;refno=107">street-by-street report</a> on the project progress.</p>
<p>Date: April 23, 2008<br />
Time: 10:30 am</p>
<p>Village Hall, 2nd Floor (Suite 250)<br />
Building, Zoning &#038; Planning Conference Room<br />
88 West McIntyre Street<br />
Key Biscayne, FL 33149</p>
<p>Contact: Jose Lopez, Owner&#8217;s Representative for the Project<br />
Phone: (305) 365-7581</p>
<p>Construction in Zones 1 and 4 of the three-zone sanitary sewer and water pipe replacement project commenced the week of July 9, 2007, in the Holiday Colony area (Zone 4). Weekly progress meetings, at 9:30 a.m. on Wednesday in the 2nd Floor BZP Conference Room, are open to the public.</p>
<p>Installation of replacement water pipes will precede placement of the new sanitary sewer mains and pipes. Affected residents will receive at least two notices of construction in the form of lime green-colored door hangers.</p>
<ul>
<li>The first notice will give approximate dates of excavation and pipe installation  in the area, and will be delivered 2-5 days in advance. Residents are advised that the work will temporarily block access to sections of the street or individual driveways.</li>
<li>The second notice will give the dates and approximate hours during which water service to a home may be disrupted.</li>
</ul>
<p>IMPORTANT CONTACT INFORMATION: Please call the following numbers<br />
(786) 236-5223: Gerard Hills, Project Field Inspector &#8211; If you have questions or experience any problems</p>
<p>(305) 274-9272: Water and Sewer Department, Miami-Dade County &#8211; For water service emergencies from 6:00 p.m. to 6:00 a.m. (overnight)</p>
]]></content:encoded>
			<wfw:commentRss>http://www.crandontimes.com/2008/04/21/sewerwater-pipe-project-progress-meeting/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
